Figure 49: Changing The Task Name; Figure 50: Call To Add Program Function Block - WAGO -I/O-IPC-C6 Manual

Wago-i/o-system 750
Hide thumbs Also See for WAGO-I/O-IPC-C6:
Table of Contents

Advertisement

118
CoDeSys 2.3 Runtime Environment
3.
To assign a new name to the task (e.g. PLC_Prog), click on "NewTask".
Then select the type of task. In this example, this is the "cyclic" type.

Figure 49: Changing the task name

4.
Add the previously created program function block PLC_PRG (see section
"Editing a Program Function Block") by right clicking on the "hour" symbol
and selecting "Append Program Call" in the context menu. Then click on
[...] button and [OK].

Figure 50: Call to add program function block

5.
Compile the example program by selecting Project > Rebuild all in the
context menu.
WAGO-I/O-SYSTEM 750
758-874/000-131 WAGO-I/O-IPC-C6
Manual
Version 1.0.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

I/o-system 750758-874/000-111

Table of Contents