Inserting The I/O Module; Figure 26: Insert I/O Module (Example); Figure 27: Snap The I/O Module Into Place (Example) - WAGO I/O SYSTEM 750 Manual

750-8208 pfc200 cs 2eth rs can dpm plc - controller pfc200
Hide thumbs Also See for I/O SYSTEM 750:
Table of Contents

Advertisement

78
Mounting
5.6.2

Inserting the I/O Module

1.
Position the I/O module so that the tongue and groove joints to the fieldbus
coupler/controller or to the previous or possibly subsequent I/O module are
engaged.

Figure 26: Insert I/O Module (Example)

2.
Press the I/O module into the assembly until the I/O module snaps into the
carrier rail.

Figure 27: Snap the I/O Module into Place (Example)

With the I/O module snapped in place, the electrical connections for the data
contacts and power jumper contacts (if any) to the fieldbus coupler/controller or to
the previous or possibly subsequent I/O module are established.
750-8208 PFC200 CS 2ETH RS CAN DPM
Version 1.1.0, valid from FW Version 02.06.20(09)
WAGO-I/O-SYSTEM 750
Manual

Advertisement

Table of Contents
loading

Table of Contents