Omron E5AR-T User Manual page 298

Programmable digital controller
Hide thumbs Also See for E5AR-T:
Table of Contents

Advertisement

Time Unit of Ramp Rate
Function
Setting
Reference
Reference
CH
PV Start
Function
Setting
Reference
Reference
pru
• This parameter is used to set the time unit for the ramp rate when
rate of rise programming is used.
Setting range
10h
: 10 hours
h
: Hours
m
: Minutes
s
: Seconds
● Related Information
Rate of Rise Programming in 5.7 Program Operation Functions (P.
5-28)
● Related Parameters
Segment Rate of Rise (Program Setting Level) (P. 8-18)
Step Time/Rate of Rise Programming (Control Initial Setting Level)
(P. 8-60)
pvst
• This parameter is used to set the method for starting the program.
• The following table outlines the start SP and the start point for each
method.
SP at start
Start method
of operation
SP Start
Segment SP
for segment 1
PV Start
PV at start of
(slope priority)
operation
PV Start (time
PV at start of
priority)
operation
Setting range
sp
: SP Start
p?-r
: PV Start (slope priority)
p?-t
: PV Start (time priority) (See note.)
Note:This selection is not possible for rate of rise programming.
● Related Information
Operation at Program Start in 5.7 Program Operation Functions (P.
5-37)
8.12 Control Initial Setting Level (l.1)
Rate of Rise Programming
Unit
Default value
m
: Minutes
Operation start point
Program operates in order from SP of
segment 1.
Operation starts at the first present SP
that matches the PV at the start of opera-
tion.
Operation starts with the PV at the start
of program operation used as the SP. The
operation start point is the beginning of
segment 1.
Unit
Default value
sp
l.1
l.1
: SP Start
8-61

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5er-t

Table of Contents