Input Shaft-Mainshaft Assembly - Jeep 1987 Wrangler Workshop Manual

Table of Contents

Advertisement

BA 10/5 MANUAL TRANSMISSION
OVERHAUL
Install the first-second detent ball (73), spring
(72) and plug (71) in the detent bore at the top of
the c a s e . Coat the plug threads with sealer
before installation and tighten it to 13
N-m
(10 ft-lbs) torque.
101109
Install the shift fork roll pins (65-67).
101110
Install the first-second lock ball and spring (57).
101154
Input Shaft-Mainshaft Assembly
Install the pilot bearing race (29) in the input
shaft (30) with an arbor press and tool B.V.I.
FM. 12.
B.V.I. FM. 12
101096
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

1987 wrangler yj1988 wrangler yj

Table of Contents