Compliant Installation - Black Box Compact T1 MT850A User Manual

Multi-service delivery terminal
Table of Contents

Advertisement

Electrical Installation and Cabling

Compliant Installation

Compliant Installation
Ferrite Beads
are in red
25-pair telco connector
25-pair telco connector
RS-232 craft port
10Base-T Ethernet
T1/E1 connectors
Signal Cables
1. Connect all of the signal cables as shown in the illustration above, and secure
them with a plastic tie. Dress the signal cables toward the left of the unit.
2. If using the 115V Power Supply, connect the -48 VDC battery power cable
3. Secure the ground lugs to the terminals using the nuts provided.
4. Secure the power cable and the ground cable with a plastic tie (not included).
Keep these cables separate from the signal cables.
5. Terminate each signal cable to its appropriate connector.
6. Secure the signal cables using the small holes along the bottom of the rack and
plastic ties (not included).
NOTE:
the Power Cables, for proper equipment operation.
3-2
Ferrite Bead
with cable loop
It is important that the Signal Cables are secured separately from
Power Cables
Power Cord
Grounding Cable
Alarm Wiring
-48 VDC Battery Power
Compact T1 - Release 6.1

Advertisement

Table of Contents
loading

Table of Contents