Powering On the TSQ 9610 System

Thermo Scientific
To power-on the TSQ 9610 system:
1. Install the GC column if you have not already done so (see
2. Be sure the GC is powered on and there is carrier gas flowing through the column into
the TSQ 9610 system.
CAUTION INSTRUMENT DAMAGE: If you power-on the TSQ 9610 instrument without
column flow, air is drawn through the column, which could damage the instrument. This
large air leak may also require that you clean the ion source.
ATTENTION DOMMAGES À L'INSTRUMENT : si vous alimentez l'instrument TSQ 9610
sans débit de colonne, l'air est aspiré à travers la colonne, ce qui peut endommager
l'instrument. Cette importante fuite d'air peut également nécessiter que vous nettoyiez la
source d'ions.
3. Open the front door of the instrument and tighten the vent valve knob. Then close the
front door of the instrument.
4. Reach over to the left side of the instrument and pull up on the power switch to power-on
the TSQ 9610 mass spectrometer.
Figure 2.
Powering On the TSQ 9610 System
Vent Valve
Knob
1
Performing Routine Maintenance
Powering On the TSQ 9610 System
Replacing a
Column).
Power Switch
TSQ 9610 Hardware Manual
7