Dynode And Multiplier Power Supply - Thermo Scientific TSQ 9610 Hardware Manual

Mass spectrometer
Table of Contents

Advertisement

Dynode and Multiplier Power Supply

Thermo Scientific
To replace the dynode and multiplier power supply
Note See the ISQ and TSQ GC-MS Spare Parts Guide for information about ordering this
component.
1. Shut down your system by following the steps in
on
page
139.
Note You do not have to remove the ion source cartridge or column or vent the
instrument. If you are using hydrogen as a carrier gas, power off the GC.
2. Slide the top cover panel toward the back of the instrument and lift it off.
3. Remove all power connections from the TSQ 9610 instrument.
3
Advanced Troubleshooting
Replacing the Power Supplies
"Shutting Down the TSQ 9610 System"
TSQ 9610 Hardware Manual
375

Advertisement

Table of Contents
loading

Table of Contents