Thermo Scientific TSQ 9610 Hardware Manual page 46

Mass spectrometer
Table of Contents

Advertisement

1
Performing Routine Maintenance
Replacing a Column
16
TSQ 9610 Hardware Manual
Figure 10. Lining Up the Column in the Column Measuring Tool
Column Outlet
14. Place a septum with a notch cut into it behind the transfer line nut. The septum marks
the place on the column where it should exit the nut.
Figure 11. Positioning the Septum
Column
Measuring Tool
15. Pull the column back from the spring loaded transfer line nut. Do not move the septum
from its position on the column.
Figure 12. Pulling the Column Back from the Spring Loaded Transfer Line Nut
Spring Loaded
Transfer Line Nut
Spring Loaded
Column
Transfer Line Nut
Column
Septum
Septum
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents