Thermo Scientific TSQ 9610 Hardware Manual page 36

Mass spectrometer
Table of Contents

Advertisement

1
Performing Routine Maintenance
Configuring the TSQ 9610 System
6
TSQ 9610 Hardware Manual
14. Connect the GC electrical cable to the wall outlet.
15. Power-on the GC.
16. Perform a leak check on the GC.
17. Install and condition the column, as described in
Note Condition the column before installing it on the mass spectrometer.
18. Make sure the TSQ 9610 instrument's power switch is in the Off (down) position.
19. Connect the TSQ 9610 instrument's electrical cable to the AC Input connector on the
mass spectrometer and to the wall outlet.
20. Follow the instructions in
instrument.
Replacing a
Powering On the TSQ 9610 System
Column.
to power on the
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents