Thermo Scientific TSQ 9610 Hardware Manual page 42

Mass spectrometer
Table of Contents

Advertisement

1
Performing Routine Maintenance
Powering Off the TSQ 9610 System
12
TSQ 9610 Hardware Manual
7. Look behind the right side of the vacuum interlock shield and twist the vent valve knob
one and a half times in a counter-clockwise direction to open the vent. Wait five minutes
for venting to complete.
IMPORTANT The process ends here if you are planning to perform system
maintenance on the TSQ 9610 mass spectrometer alone (for example, to replace the
filament). You don't need to turn off the GC, data system, and autosampler.
8. Power-off all the remaining instruments. Refer to their user documentation for specific
instructions.
CAUTION If you need to work inside the TSQ 9610 instrument, disconnect it from the
electrical outlet. Be sure to reconnect it to the AC Input connector on the back of the
instrument after finishing your work and closing the instrument.
ATTENTION Si vous devez travailler à l'intérieur de l'instrument TSQ 9610, débranchez-le
de la prise électrique. Assurez-vous de le reconnecter au connecteur d'entrée AC à l'arrière
de l'instrument après avoir terminé votre travail et fermé l'instrument.
Figure 7.
Connecting the TSQ 9610 Instrument to the Electrical Power
Power Switch
AC Input
Connector
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents