Transfer Line - Thermo Scientific TSQ 9610 Hardware Manual

Mass spectrometer
Table of Contents

Advertisement

Transfer Line

Thermo Scientific
To replace the transfer line and ferrule
IMPORTANT Be sure to install the transfer line correctly or the ion source will not align
correctly.
Note See the ISQ and TSQ GC-MS Spare Parts Guide for information about ordering
these components.
1. Shut down your system by following the steps in
on
page
139.
2. Open the front door of the GC and disconnect the column and transfer line nut.
3. Move the TSQ 9610 instrument away from the GC so you can access the transfer line on
the right side.
WARNING BURN HAZARD: The transfer line may be hot, so be careful.
4. Use a T20 Torxhead screwdriver to remove the five screws on the right side panel.
Figure 429. Removing the Right Side Panel Screws
5. Slide the right side panel to the right of the instrument and lift it off.
6. Use a T20 Torxhead screwdriver to remove the four screws around the manifold door.
Note Remove the screws completely so that they do not scratch the manifold when you
close the door.
Replacing the Calibration Gas Components
"Shutting Down the TSQ 9610 System"
Right Side
Panel Screws
TSQ 9610 Hardware Manual
3
Advanced Troubleshooting
391

Advertisement

Table of Contents
loading

Table of Contents