Download Print this page

Fenwal 4R5707 Operator's Manual page 395

Alyx component collection system

Advertisement

Instrument
Maintenance
07-19-01-518 – January 2009
A
C
LYX
OMPONENT
Chapter 6 – Maintenance
Two types of maintenance are required for the instrument:
• Routine Maintenance
• Preventive Maintenance
Routine Maintenance
Routine maintenance is required for consistent performance of
the instrument. Routine maintenance is performed daily and
monthly.
Daily –
• Power Cycle Instrument
• Perform Scale Checks
• Wipe Centrifuge Compartment
Monthly –
• Inspect/Clean Fan Filters
• Clean Pump Block Gasket
• Clean Optical Sensors
• Inspect Centrifuge Gasket
As Needed –
• Clean Touch Screen
• Clean Instrument Housing
The instrument's separation system does not require routine
testing or calibration by an operator other than the scale checks
mentioned above. The instrument checks for proper
functionality during kit installation and prime and monitors
operation during collection.
Reference Chapter 2, System Overview, to view pictures of the
instrument components that require cleaning and their location.
C
S
O
OLLECTION
YSTEM
C
HAPTER
'
M
PERATOR
S
ANUAL
6 – M
AINTENANCE
6-3

Advertisement

loading

This manual is also suitable for:

4r5725