Download Print this page

Fenwal 4R5707 Operator's Manual page 302

Alyx component collection system

Advertisement

A
C
C
LYX
OMPONENT
OLLECTION
C
4C – A
2RBC-NLR C
HAPTER
LYX
Beginning
Kit-Check and
Prime Sequences
Check Button
Clamp Donor
Line Prompt
4C-22
S
O
'
M
YSTEM
PERATOR
S
P
OLLECTION
ROCEDURE
At this point, the disposable kit should be installed on the
instrument. Follow the directions below to complete the
kit-check and prime sequences.
1.
Touch the check button to verify the kit has been loaded on
the instrument. The instrument will then display the clamp
donor line prompt.
Typical Screen with Clamp Donor
Note: Changing any kit information after touching the check
button will require removal and re-load of the kit.
2.
Ensure the clamps on the donor line and the line leading to
the sampling pack are closed.
CAUTION: Failure to follow instructions prior to venipuncture
may result in dilution of whole blood samples.
Note: Ensure the clamp on the line from the cassette leading to
the red cell storage containers is open.
ANUAL
Line Prompt
07-19-01-518 – January 2009

Advertisement

loading

This manual is also suitable for:

4r5725