Download Print this page

Fenwal 4R5707 Operator's Manual page 239

Alyx component collection system

Advertisement

07-19-01-518 – January 2009
A
C
LYX
OMPONENT
C
HAPTER
Ensure that the rim of the separation chamber fits snugly in
the carrier mount.
13. Close the latch to lock the separation chamber into position.
Push down on the latch to ensure it is completely closed.
Pull up on the latch once to verify that the latch has locked
into place. If closed correctly, the latch cannot be pulled
back up.
Note: If the latch does pull up, reseat the separation chamber
into the carrier. Then close as instructed in step 13.
14. Bend the umbilicus upward and insert it within the umbilicus
guides on the carrier. Ensure the umbilicus is secure within
the guides.
Umbilicus
Guides
Separation Chamber Properly Installed in Carrier
C
S
OLLECTION
4B – A
RBC/P
LYX
LASMA
O
'
M
YSTEM
PERATOR
S
C
P
OLLECTION
ROCEDURE
Latch
ANUAL
4B-15

Advertisement

loading

This manual is also suitable for:

4r5725