Download Print this page

Fenwal 4R5707 Operator's Manual page 195

Alyx component collection system

Advertisement

Beginning
Kit-Check
and Prime
Sequences
Check Button
Clamp Donor
Line Prompt
07-19-01-518 – January 2009
A
C
LYX
OMPONENT
C
HAPTER
At this point, the disposable kit should be installed on the
instrument. Follow the directions below to complete the
kit-check and prime sequences.
1.
Touch the check button to verify the kit has been loaded on the
instrument. The instrument will then display the clamp donor
line prompt.
Typical Main Data Screen with Clamp Donor
Typical Main Data Entry Screen – Clamp Donor Line Prompt
Note: Changing any kit information after touching the check button
will require removal and re-load of the kit.
2.
Ensure the clamps on the donor line and the line leading to
the sampling pack are closed.
C
S
OLLECTION
YSTEM
4A – A
2RBC-LR C
LYX
Line Prompt
Functionally Closed Kit
O
'
M
PERATOR
S
ANUAL
P
OLLECTION
ROCEDURE
4A-25

Advertisement

loading

This manual is also suitable for:

4r5725