Download Print this page

Fenwal 4R5707 Operator's Manual page 296

Alyx component collection system

Advertisement

A
C
C
LYX
OMPONENT
OLLECTION
C
4C – A
2RBC-NLR C
HAPTER
LYX
4C-16
S
O
'
M
YSTEM
PERATOR
S
P
OLLECTION
ROCEDURE
15. Pull the chamber up to engage the latch. An audible click
will be heard when the latch locks the chamber in place.
Chamber Properly Latched
Note: The green indicator is displayed when the chamber is
properly loaded or when the chamber is completely unloaded.
If any red is displayed, the latch is not engaged. Pull up on the
chamber until the green indicator appears as shown in the above
figure.
Chamber Improperly Latched
16. Bend the umbilicus upward and insert it within the umbilicus
guides on the carrier. Ensure the umbilicus is secure within
the guides.
Centrifuge Chamber Properly Installed in Carrier
ANUAL
07-19-01-518 – January 2009
Green
Indicator
Red
Indicator

Advertisement

loading

This manual is also suitable for:

4r5725