Download Print this page

Fenwal 4R5707 Operator's Manual page 219

Alyx component collection system

Advertisement

Check Button
Back Button
Check
Button
07-19-01-518 – January 2009
A
C
LYX
OMPONENT
C
HAPTER
4.
Seal the segment tubing from each red cell storage container
where the segmented tubing attaches to the "Y."
5.
Remove the "Y" connector.
6.
Remove the clamps on the segment tubings.
7.
Fold the tubing connected to each red cell storage container
and insert tubing into each container's side slits.
8.
Allow the product volume readings to settle. Press the check
button to verify that the products are hanging from the scales,
sealed and ready for final weights.
9.
A task confirmation screen will be displayed to remind the
operator of the tasks that need to be completed prior to
finalizing the weights.
Typical Task Confirmation Screen
Note: If all tasks have not been completed, touch the back button
to return to the previous screen.
10.
If all the tasks have been completed, touch the check button to
finalize the weights.
11.
After the check button is touched, the final weights are
displayed on the Procedure Information Screen. Remove
the red cell storage containers from the scales and label the
products according to applicable standard operating
procedures.
C
S
OLLECTION
YSTEM
4A – A
2RBC-LR C
LYX
O
'
M
PERATOR
S
ANUAL
P
OLLECTION
ROCEDURE
4A-49

Advertisement

loading

This manual is also suitable for:

4r5725