Download Print this page

Fenwal 4R5707 Operator's Manual page 240

Alyx component collection system

Advertisement

A
C
C
LYX
OMPONENT
OLLECTION
C
4B – A
RBC/P
HAPTER
LYX
4B-16
S
O
YSTEM
PERATOR
C
P
LASMA
OLLECTION
The following steps (15 through 18) are used with a 3-Arm
centrifuge carrier configuration that locks the separation chamber
into position after the chamber is inserted into the carrier arms
and pulled up to engage the latch. A green indicator on the latch
informs the operator when the chamber has been properly loaded
or if the chamber is completely unloaded. A red indicator
informs the operator when it is not properly loaded. To remove
or reseat the chamber, press on the latch and pull the chamber
down.
15. Rotate the centrifuge carrier so that the two umbilicus guides
are on the left and align the carrier latch with the opening in
the carrier mount.
Umbilicus
Guides
16. Slide the separation chamber into the carrier arms at a slight
angle with the front in a lower position than the back.
Placing the Separation Chamber into Carrier
'
M
S
ANUAL
ROCEDURE
Carrier Latch
Alignment of Carrier Latch
07-19-01-518 – January 2009
3-Arm
Carrier

Advertisement

loading

This manual is also suitable for:

4r5725