Download Print this page

Fenwal 4R5707 Operator's Manual page 188

Alyx component collection system

Advertisement

A
C
C
LYX
OMPONENT
OLLECTION
C
4A – A
2RBC-LR C
HAPTER
LYX
4A-18
S
O
YSTEM
PERATOR
P
OLLECTION
ROCEDURE
The following steps (15 through 18) are used with a 3-Arm
centrifuge carrier configuration that locks the separation chamber
into position after the chamber is inserted into the carrier arms and
pulled up to engage the latch. A green indicator on the latch
informs the operator when the chamber has been properly loaded
or red when it is not properly loaded. To remove or reseat the
chamber, press on the latch and pull the chamber down.
15.
Rotate the centrifuge carrier so that the two umbilicus guides
are on the left and align the carrier latch with the opening in
the carrier mount.
Umbilicus
Guides
16.
Slide the separation chamber into the carrier arms at a slight
angle with the front in a lower position than the back.
Placing the Separation Chamber into Carrier
'
M
S
ANUAL
Carrier Latch
Alignment of Carrier Latch
07-19-01-518 – January 2009
3-Arm
Carrier

Advertisement

loading

This manual is also suitable for:

4r5725