Download Print this page

Fenwal 4R5707 Operator's Manual page 346

Alyx component collection system

Advertisement

A
C
C
LYX
OMPONENT
OLLECTION
C
4D– 2RBC S
HAPTER
Check Button
Hang Product
Prompt
4D-28
S
O
YSTEM
PERATOR
U
R
INGLE
NIT
ECOVERY
2.
Separate the filled red cell storage container from the rest of
the kit.
Note: Follow standard operating procedures regarding the
empty red cell storage container.
3.
Seal lines attached to the solution containers, if desired.
Note: The lines to the ACD, saline, and preservation solution
containers must be sealed at this time if these containers will be
disposed as non-biohazard waste.
4.
Touch the check button to verify the kit has been sealed and
the red cell storage container has been removed.
WARNING: Handle and dispose of all biologically
contaminated materials according to local and national
government requirements.
Hanging Product to Weigh
After the operator touches the check button to verify the kit has
been sealed and the red cell storage container has been removed,
the touch screen will display the hang product prompt.
To weigh the product, perform the following steps:
1.
Remove the plasma, red cell, and in-process containers from
their locations on the hanging scales.
2.
Remove the clamp on the segment tubing.
'
M
S
ANUAL
P
ROCEDURE
.
Typical Procedure Information Screen
with Hang Product Prompt (SUR)
07-19-01-518 – January 2009

Advertisement

loading

This manual is also suitable for:

4r5725