Secondary Camshaft Drive Chain Installation - Suzuki XL7 2007 Service Manual

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

1D-284 Engine Mechanical:
Secondary Camshaft Drive Chain
Installation - Left Side (Fourth Design)
Special tool
EN 46105 Camshaft Holding Tool
EN 46111 Crankshaft Rotation Socket
NOTE
There should be no need to rotate the
camshaft more than 10 degrees. Using the
hex cast into the camshaft rotate the
camshaft in order to install the EN 46105.
1. Install the EN 46105-1 onto the rear of the left
camshafts.
NOTE
All camshafts must be locked in place before
installation of any camshaft drive chains.
2. Ensure that the EN 46105-1 is fully seated onto the
camshafts.
3. Ensure the crankshaft is in the stage one timing
position with the crankshaft sprocket timing mark (1)
aligned to the stage one timing mark on the oil pump
cover (2) using the EN 46111. Refer to "Camshaft
Timing Drive Chain Alignment Diagram (Third
Design)" "Camshaft Timing Drive Chain Alignment
Diagram (Fourth Design)"- Stage One.
4. Install the left secondary camshaft drive chain.
5. Place the left secondary camshaft drive chain
around the inner sprocket of the left camshaft
intermediate drive chain idler with the timing
camshaft drive chain link (1) aligned to the alignment
access hole (2) made in the left camshaft
intermediate drive chain idler outer sprocket.

Advertisement

Table of Contents
loading

Table of Contents