Suzuki XL7 2007 Service Manual page 634

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

1D-294 Engine Mechanical:
2. Install the right camshaft intermediate drive chain
idler.
CAUTION
!
Refer to "Fastener Notice: ".
3. Install the camshaft intermediate drive chain idler
bolt.
Tightening torque
Tighten the camshaft intermediate drive chain
idler bolt to 58 N⋅m (43 lb ft).
Reference: "Primary Camshaft Drive Chain Installation
(Fourth Design): ".
Primary Camshaft Drive Chain Installation
(Third Design)
NOTE
Ensure that the crankshaft is in the stage one
timing drive assembly position.
1. Install the primary camshaft drive chain.
2. Wrap the primary camshaft drive chain around the
large sprockets of each camshaft intermediate drive
chain idler and the crankshaft sprocket.
3. The left camshaft intermediate drive chain idler
timing mark (1) will align with a timing camshaft drive
chain link (2).

Advertisement

Table of Contents
loading

Table of Contents