Suzuki XL7 2007 Service Manual page 948

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

1J-55 Charging System:
4. Tighten the generator bolts in the sequence shown.
Tightening torque
Tighten the bolts to 50 N⋅m (37 lb ft).
5. Install the drive belt. Refer to "Drive Belt
Replacement: ".
6. Connect the engine harness electrical connector to
the generator.
Fastener Tightening Specifications - Engine Electrical
Air Conditioning (A/C) Evaporator Line to Battery Tray Nut
Battery Tray Bolt
Battery Hold Down Bolt
Battery Negative Cable Terminal Bolt
Battery Positive Cable Terminal Bolt
Battery Tray Support Bracket Bolt
Coolant Surge Tank Bolt
Generator Battery Positive Terminal Nut
Generator Bolt
Generator Bracket Bolt
Negative Battery Cable to Inner Fender Bolt
Negative Battery Cable to Transaxle Nut
Remote Battery Terminal Nut
UHFB Connector Bolt
Under Hood Fuse Block (UHFB) Battery Positive Terminal Nut
Specifications
Application
7. Install the positive battery cable terminal to the
generator.
8. Install the positive battery cable nut at the generator.
Tightening torque
Tighten the nut to 20 N⋅m (15 lb ft).
9. Position the positive battery cable boot at the
generator terminal.
10. Connect the negative battery cable. Refer to "Battery
Negative Cable Disconnection and Connection".
Specification
Metric
15 N⋅m
15 N⋅m
15 N⋅m
17 N⋅m
17 N⋅m
25 N⋅m
6 N⋅m
20 N⋅m
50 N⋅m
50 N⋅m
12 N⋅m
45 N⋅m
17 N⋅m
4 N⋅m
15 N⋅m
English
11 lb ft
11 lb ft
11 lb ft
13 lb ft
13 lb ft
18 lb ft
53 lb in
15 lb ft
37 lb ft
37 lb ft
106 lb in
33 lb ft
13 lb ft
35 lb in
11 lb ft

Advertisement

Table of Contents
loading

Table of Contents