Suzuki XL7 2007 Service Manual page 415

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

Installation Procedure
1. Install the upper intake manifold gaskets to the lower
intake manifold and install the fir tree retainers to
retain the upper intake manifold gasket position.
2. Install the upper intake manifold.
CAUTION
!
Refer to "Fastener Notice: " in Cautions and
Notices.
3. Apply threadlock to the bolt threads. Refer to
"Sealers, Adhesives, and Lubricants". Install the
upper intake manifold bolts.
Tightening torque
Tighten the bolts to 25 N⋅m (18 lb ft).
4. If the upper manifold was replaced, complete the
following steps:
a. Install the throttle body. Refer to "Throttle Body
Assembly Replacement".
b. Install the EVAP purge solenoid valve. Refer to
"Evaporative Emission Canister Purge Solenoid
Valve Replacement: ".
5. Install the engine harness retaining clips.
6. Install the brake booster vacuum hose to the intake
manifold.
7. Install the brake booster vacuum hose to the intake
manifold.
8. Position the bleed pipe.
9. Install the bleed pipe hose clamp (2).
10. Install the bleed pipe bolts (1).
Tightening torque
Tighten the nut to 10 N⋅m (89 lb in).
11. Connect the coolant hose bleed pipe (4).
Engine Mechanical:
1D-75

Advertisement

Table of Contents
loading

Table of Contents