ENGINE AND TRANSMISSION MOUNTING SYSTEM
2-11
16) Connect oil cooler hoses. (AfT)
17) Connect engine and transmission, and tighten bolt on the
right side.
Tightening torque:
46 - 54 N·m (4.7 - 5.5 kg-m, 34 - 40 ft-Ib)
18) I nstall starter.
Tightening torque:
Upper bolt:
46 - 54 N·m (4.7 - 5.5 kg-m, 34 - 40 ft-Ib)
Lower nut:
30 - 36 N·m (3.1 - 3.7 kg-m, 22 - 27 ft-Ib)
19) Install pitching stopper.
Tightening torque
Transmission side:
44 - 54 N-m (4.5 - 5.5 kg-m, 33 - 40 ft-Ib)
20) Install and tighten torque converter mounting bolts.
(AfT)
(1) Align torque converter with drive plate at mounting
holes.
(2) While
manually cranking engine, tighten torque
converter-to-drive plate mounting bolts securely - one at
a time.
Be careful not to drop bolts into torque converter housing.
Tightening torque:
23 - 26 N·m (2.3 - 2.7 kg-m, 17 - 20 ft-Ib)
(3) Install timing hole plug.
21) Install air intake boot.
22) Connect the following hoses.
Diff. lock vacuum hose (MfT Full-Time 4WD)
Secure air breather hose to pitching stopper with a clip band.
23) Connect the following harness connectors.
(A/T)
• O
2
sensor connector
Transmission harness connector
Inhibitor switch connector
Revolution sensor connector (4WD)
(MIT)
O
2
sensor connector
Neutral switch connector
Back-up light switch connector (FWD)
Transmission cord connector (back-up and diff. lock
indicator light switch) (Full-Time 4WD)
25
24) Connect meter cable.
Manually tighten cable nut all the way and then turn it
approximately 30° more with a wrench.
25) Connect clutch cable and hill-holder cable. (MIT)
After connecting, test operation of hill-holder on an upgrade.
26) Install front exhaust pipe.
a. Be sure to use new gasket.
b. Position front exhaust pipe in hanger bracket, and align it
with adjacent parts.
c. Tighten all parts in numerical sequence, as shown in figure
below, to specified torque.
-----.
L2-1433
Fig. 47
Tightening torque:
Front exhaust pipe to engine:
25 - 29 N·m (2.6 - 3.0 kg-m, 19 - 22 ft-Ib)
Front exhaust pipe to bracket:
25 - 34 N·m (2.6 - 3.5 kg-m, 19 - 25 ft-Ib)
Front exhaust pipe to rear exhaust pipe:
13 - 23 N·m (1.3 - 2.3 kg-m, 9 - 17 ft-Ib)
Also check to
be
sure there is no gas leakage after installation
is completed.
27) Connect ground cable to battery and transmission side.
28) Check transmission oil level.
Add gear oil if necessary.
29) Check ATF with engine idling.
If lower than the specified level, stop engine and add ATF.
(A/T)
30) Start engine and re-check oil levels.