Subaru XT 1988 Service Manual page 176

Table of Contents

Advertisement

2-3
ENGINE
9)
Install timing belt.
(1) Install sprocket No.2 and sprocket to crankshaft.
Sprocket No.2 can be identified by the absence of dowel pin.
Fig.
2-1
,~.
_;""$
(2) Install crankshaft pulley to crankshaft, and tighten
bolt temporarily.
Crankshaft pulley
(4) Align timing mark on camshaft sprocket LH with
notch in belt cover.
L2-494
Fig.
24
(5) Attach timing belt No.2 to crankshaft sprocket
No.2, oil pump sprocket, belt idler, camshaft sprocket, in
that order, avoiding downward slackening of the belt.
Timing belt No.2
L2-1050
~
____________________________________
L2_-_10_4~7
F~25
Fig.
22
(3) Align the center of three lines scribed on the flywheel
with timing mark on flywheel housing.
Fig. 23
20
(6) Loosen tensioner No.2 tightening bolt
@
by
1/2
turn to apply tension to belt.
(7) Push timing belt by hand to ensure smooth move·
ment of tensioner.
Fig.
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents