Operation Of Partitions During Smart Configure - Hitachi Compute Blade 2000 User Manual

Hide thumbs Also See for Compute Blade 2000:
Table of Contents

Advertisement

When the following changes are executed in the partition configuration, Smart
Configure is automatically executed and the setting information in the
management module is updated.
(a) When changing the number of server blades that belong to the partition using
the PR command.
(b) When inserting a server blade
(c) When powering on the server blade after plugging and unplugging the I/O
board module.
(5) When the BMC (Baseboard Management Controller) is completely rebooted
When the power of the server blade is off after BMC is rebooted with the PR
command or by BMC itself, Smart Configure is executed by the management
module and the setting information in the management module is updated.
Operation of partitions during Smart
Configure
The light emitting diode (LED) on the front panel of the server blade blinks during
Smart Configure.
While the condition LED (CND) is blinking, the power to the partition is temporarily
turned on.
For details of the condition LED that blinks, see "Standard server blade" in Chapter 2
for the description of the names and functions of each part.
Time required for Smart Configure
The time required to perform Smart Configure varies depending on the number of
installed central processing unit (CPUs), memory size, and the types and number
of PCI cards installed.
Xeon server blade
Partition
3 to 15
1521
Required time (minutes)

Advertisement

Table of Contents
loading

Table of Contents