6. Route the power cord. Use best practices when routing power cords and other cables. A cable
management arm is available to help with routing. To obtain a cable management arm, contact a Hitachi
Vantara authorized reseller.
7. Connect the power cord to the AC power source.
8. Be sure that the power supply LED is green.
The installation is complete.
Energy pack options
Hitachi Vantara offers two backup power options to back up write cache content on the controllers in case of an
unplanned server power outage.
•
Smart storage battery
•
Smart storage hybrid capacitor
Once installed, the status of the energy pack displays in iLO. For more information, see the iLO user guide on the
Hitachi Vantara website.
Smart storage battery
The Smart Storage battery supports the following devices:
Smart array SR controllers
A single 96W battery can support up to 24 devices.
After the battery is installed, it might take up to two hours to charge. Controller features requiring backup power
are not re- enabled until the battery is capable of supporting the backup power.
This server supports the 96W Smart storage battery with the 145mm cable.
Smart storage hybrid capacitor
The Smart storage hybrid capacitor supports the following devices:
SmartRAID SR controllers
The capacitor pack can support up to two devices.
This server supports the Smart storage hybrid capacitor with the 145mm cable.
Before installing the Smart storage hybrid capacitor, verify that the system BIOS meets the minimum firmware
requirements to support the capacitor pack.
IMPORTANT: If the system BIOS or controller firmware is older than the minimum recommended
firmware versions, the capacitor pack will only support one device.
The capacitor pack is fully charged after the system boots.
Minimum firmware versions
Product
HA810 G2 Server
Minimum firmware version
1.40
Hitachi Advanced Server HA810 G2 User Guide