Figure 26: Placement of connectors, LED and button.
Power supply
The power supply jacks are located at the rear of the IPBL. The IPBL can be powered with 110/
230 VAC, 60/50 Hz. The power supply feeds both the IPBL and the connected RFPs.

Mounting the IP-DECT Gateway (IPBL)

Mount the product in a standard 19" rack according to the following figure.
Avaya DECT R4 - Installation and Maintenance Guide
Po
Name
s
1
Reset
2
Status LED
3
LAN
4
Synchronization
5
Reference
6
Base Station 01-
16
7
Power Supply
Installing and operating the IP-DECT Gateway (IPBL)
Function
Button used to reset the IPBL.
LEDs that indicate the status on
the IPBL.
Port used to connect
10BASE-T/100BASE-T
Ethernet connection.
LAN1 port must be used in the
IP-DECT system. The LAN2
port is for administration only. If
you enable RSTP, both the
ports are utilized by the system.
See
Enabling RSTP (only for
IPBL)
on page 142.
Interfaces used for
synchronizing ring-in and
ring-out.
Interfaces used to reference
sync-in and reference sync-out .
Interfaces used to connect
ISDN UPN DECT base station.
Interfaces used for power
connection (located at the rear
of the IPBL).
89