Installation And Configuration; Multiple Battery Charger Installation - Avaya DECT R4 Installation And Administration Manual

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

Installation and Configuration

Multiple Battery Charger Installation

General
!
Important:
The unit shall be installed by authorized personnel only.
Important:
The units shall be placed in a dry environment with a temperature range from
+5° C up to + 40° C (41° F to 104° F).
The units shall be mounted on a vertical wall.
Avoid mounting the Multiple Battery Charger in a sunlit place. This can affect the charging
capacity.
The unit shall be mounted on concrete or plaster walls only.
If the Multiple Battery Charger is connected to a power supply via an AC wall plug, serial
power supply connection is not allowed.
When using a fixed connection, up to five Multiple Battery Charger or Rackmount Charger
can be serially connected to the same AC connection.
If the Multiple Battery Charger is connected to a power supply via an AC wall plug, the
socket-outlet shall be situated near the equipment and shall be easily accessible.
If the Multiple Battery Charger is connected to a power supply via a fixed connection, a
readily accessible disconnect device shall be incorporated in the building installation
wiring.
Delivery includes:
Battery Pack Charger
Power supply cord including IEC C14 connector (male)
Inlet accessory kit including cable support holders and screws
Note:
An extension cord IEC C13 AC connector (female IEC60320-C13) to wall socket
Note:
has to be ordered separately. It shall be connected between the pre-installed IEC
C14 AC connector (male) and the wall socket.
Avaya DECT R4 - Installation and Maintenance Guide
Installation and Configuration
02/2016
285

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents