Commissioning; Installation Test; Charging; Communication With Aiws Or Pdm - Avaya DECT R4 Installation And Administration Manual

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

Note:
Service Discovery might not work if the Rackmount Charger is not in the same
Note:
subnet as the AIWS.

Commissioning

The commissioning includes the following:

Installation test

Charging

Communication with Avaya In-Building Wireless Server (AIWS) or Portable Device
Manager (PDM)
Installation test
For Installation test, see chapter
Charging
To verify that the charging works, follow these instructions:
1. Check that the LED on the front of the charger(s) is lit.
2. Place a telephone in a charging slot. Start of charging may be indicated differently
depending on telephone model.

Communication with AIWS or PDM

See
figure 78
Follow these instructions to start PDM or AIWS:
If you are using AIWS:
1. Check that the Rackmount Charger is connected.
2. Open a web browser and enter the URL to access the AIWS/AIWS2.
3. Click on Device Manager. The Device Manager window appears.
Avaya DECT R4 - Installation and Maintenance Guide
Installation test
on page 306 to see the communication connections to the charger.
on page 302 or 309.
Commissioning
309
02/2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents