Opening The Housing - Avaya DECT R4 Installation And Administration Manual

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

4. Mount Elise 2 Server (AIWS Hardware) on the wall, follow instructions in
page 537 and
Mounting together with other units
5. Set the system bus address, follow instructions in
6. Connect the system bus, follow instructions in
Connection of supply voltage
7. Optionally connect outputs and inputs described in
8. Activate the battery, follow instructions in
9. Perform a network parameter setup of Elise 2 Server (AIWS Hardware), follow instructions
in
Setup of network parameters
10. Connect Ethernet connector to the Local Area Network, follow instructions in
of ethernet
11. Perform a test of the installation, follow the instructions in
page 546.
12. Continue with additional parameter setup for the unit according to chapter
- and respective software application documentation.
13. Make a backup copy of all parameters.

Opening the housing

Use a screwdriver or similar to release the cover by applying a light pressure to the two snap
catches (1) and remove the cover (2).
Figure 171: Opening the Elise 2 Server (AIWS Hardware) housing.
1
1
Wiring runs
The plastic partition is scored to facilitate breaking at convenient intervals.
Avaya DECT R4 - Installation and Maintenance Guide
on page 540.
on page 545.
on page 544.
on page 537.
System 900 addressing
Connection of system bus
Additional connections
Activation of battery
Installation
Mounting
on page 538.
on page 538 and
on page 540.
on page 543.
Connection
Installation test procedure
02/2016
on
on
533