Installing Elise 3 Server (AIWS2 Hardware)
Parameter
Supply voltage:
Current consumption:
Delivery includes:
Tools etc. required:
1. Separately ordered license certificate
558
Avaya DECT R4 - Installation and Maintenance Guide
Value
12 – 24 V/DC ±10%
Max 275 mA at 100 V AC input Max 1 A
at 12 V DC input
Elise 3 Server (AIWS2 Hardware)
Two assembly brackets
Four screws size 3.5×40 together with four wall plugs
Four MFT screws size M3×6 for fastening the assembly brackets
Power cable
Avaya Safety leaflet for AIWS2
●
Getting started document: Elise 3, Embedded Linux Server
●
including safety and security instructions
Philips screwdriver (Ph No. 2) for the wall screws size
●
3.5×40
Torx (T10) for the MFT screws size M3×6
●
Screwdriver 0.40 x 2.5 mm for screw connectors on the rear
●
side
Cutting pliers
Ethernet cable
Screws for installation
Multimeter
Power supply
PC with Microsoft Internet Explorer 8.0 and 9.0, Mozilla Firefox 3.6
up to 12.0
Sun™ Java™ Runtime JRE 6
Software "Route to Elise". (Available from the distributor)
1
02/2016