Installing Multiple Battery Charger
Figure 69: The mains power supply connection
8. Mount the safety cover and fasten it with one screw.
9. Secure the mains power supply cable with two screws (2), which are provided in the parts
bag, see
10. Replace the top cover, see
11. Fasten the power cord to the wall depending on local regulations.
12. If more rack chargers shall be connected, repeat the above steps 1-12 for the next unit.
Installation test
1. When the fixed installation is completed, apply AC power by switching on the disconnect
device.
2. Place a battery in the charging slot.
3. A yellow LED indicates that charging starts while a green LED indicates a fully charged
battery.

Commissioning

The commissioning includes the following:
Installation test
Charging
Installation test
For Installation test, see chapter
292
Avaya DECT R4 - Installation and Maintenance Guide
figure
68.
figure
Installation test
66.
on page 292 or 287.