Avaya DECT R4 Installation And Administration Manual page 86

Hide thumbs Also See for DECT R4:
Table of Contents

Advertisement

Installing and operating the IPBS and IPBL
Connecting the Base Station cables
1. If the cables must enter the base station centrally from above, guide the cables through the
recess in the middle of the base station. See
page 86.
Note:
Applicable to the IPBS1 only.
Note:
Figure 23: Cables entering centrally from above
1
Figure notes:
1. Data cable
2. Plug the modular jack of the data cable into one of the data/power connectors.
3. To use an AC-adapter:
Plug the modular jack of the AC-adapter into one of the data/power connectors.
Plug the AC adapter into a wall outlet.
Mounting the Base Station
1. Hold the base station flat against the mounting bracket and move the base station
downwards until the base station clicks, see
86
Avaya DECT R4 - Installation and Maintenance Guide
2
Cables entering centrally from above
2. Power cable (if used)
figure
24.
on
02/2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents