INTRODUCTION
2. PREPARATION FOR INSTALLATION
(a) SPOT WELD POINTS
(1) When welding panels with a combined thickness of
F10011A
(b) APPLICATION OF WELD-THROUGH PRIMER
(SPOT SEALER)
(1) Remove the paint from the portion of the new parts
F10012
(c) MAKING HOLES FOR PLUG WELDING
(1) For areas where a spot welder cannot be used, use a
REFERENCE:
Thickness of welded portion
1.0 (0.04) - 1.5 (0.06)
F10013A
(d) SAFETY PRECAUTIONS FOR ELECTRICAL COM-
PONENTS
(1) When welding, there is a danger that electrical compo-
(2) Before starting work, disconnect the negative terminal
F10014
(e) ROUGH CUTTING OF JOINTS
30mm
(1) For joint areas, rough cut the new parts, leaving 20 -
Overlap
F10015A
over 3mm (0.12in.), use a MIG (Metal Inert Gas) weld-
er for plug welding.
HINT: Spot welding will not provide sufficient durability
for panels over 3mm (0.12in.) thick.
and body to be welded, and apply weld-through prim-
er.
puncher or drill to make holes for plug welding.
1.0 (0.04) under
1.5 (0.06) over
nents will be damaged by the electrical current flowing
through the body.
of the battery and ground the welder near the welding
location of the body.
30mm (0.79 - 1.18in.) overlap.
IN-11
mm (in.)
Size of plug hole
5 (0.20) ø over
6.4 (0.25) ø over
8 (0.31) ø over