Chapter 3 Unpacking
Lift the drive by hooking the lifting hole. It is now
ready for installation
.
Frame G
Crate 1 (VFDXXXC63B-00)
Remove the 6 clips on the side of the crate with a
flathead screwdriver. (As shown in figure below.)
1
2
3
Remove the crate cover, EPEs and manual.
4
5
6
3-6
Lift the drive by hooking the lifting hole. It is now
ready for installation.
Crate 2 (VFDXXXC63B-21)
Remove the 6 clips on the side of the crate with a
flathead screwdriver. (As shown in figure below.)
1
2
3
Remove the crate cover, EPEs, rubber and manual.
4
5
6