Delta C2000 Series User Manual page 109

Vector control drive
Hide thumbs Also See for C2000 Series:
Table of Contents

Advertisement

Chapter 7 Optional Accessories
1.
On the conduit box, loosen 7 of the cover screws and remove the cover. Screw torque: 24~26kg-cm
(20.8~22.6Ib-in)[2.35~2.55Nm].
2.
On the drive, loosen 4 of the cover screws and press the tabs on each side of the cover to remove the cover,
as shown in the following figure. Screw torque: 12~15kg-cm (10.4~13Ib-in)[1.18~1.47Nm].
3.
Remove the top cover and loosen the screws.
M5 Screw torque: 24~26kg-cm (20.8~22.6Ib-in)[2.35~2.55Nm]
M8 Screw torque: 100~120kg-cm (86.7~104.1Ib-in)[9.8~11.76Nm]
4.
Install the conduit box by fastening all the screws shown in the following figure.
M5 Screw torque: 24~26kg-cm (20.8~22.6Ib-in)[2.35~2.55Nm]
M8 Screw torque: 100~120kg-cm (86.7~104.1Ib-in)[9.8~11.76Nm]
4
1
2
3
7-28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

690v

Table of Contents