Delta C2000 Series User Manual page 133

Vector control drive
Hide thumbs Also See for C2000 Series:
Table of Contents

Advertisement

Chapter 7 Optional Accessories
Frame D & E
1. Loosen 8 screws and remove Fixture 2 (as shown in
the following figure).
3. Fasten 4 screws (as shown in the following figure).
Screw torque: 30~32kg-cm (26.0~27.8Ib-in)
[2.94~3.14Nm].
5. Fasten 4 screws (as shown in the following figure).
Screw torque: 24~26kg-cm (20.8~22.6Ib-in)
[2.35~2.55Nm].
7. Place 4 screws (M10) through Fixture 1&2 and the plate then fasten the screws. (as shown in the following
figure)
Frame D0/D M10*4
Screw torque: 200~240kg-cm (173.6~208.3Ib-in)[19.6~23.52Nm].
Frame E M12*4
Screw torque: 300~400kg-cm (260~347Ib-in)[29.4~39.2Nm].
2. Loosen 10 screws and remove Fixture 1 (as shown
in the following figure).
4. Fasten 5 screws (as shown in the following figure).
Screw torque: 30~32kg-cm (26.0~27.8Ib-in)
[2.35~2.55Nm].
6. Fasten 5 screws (as shown in the following figure).
Screw torque: 24~26kg-cm (20.8~22.6Ib-in)
[2.94~3.14Nm].
7-52

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

690v

Table of Contents