Toyota 3S-GE Repair Manual page 271

Hide thumbs Also See for 3S-GE:
Table of Contents

Advertisement

ENGINE — EFI SYSTEM
EG'257
\/_
/
J
_
Protrusion
Y PI784l
(b)
Attach a new gasket to the ACIS assembly, facing the
protrusion downward.
p /'*5.
A
\§'
l'»
/
'.8
.
0<
/
4.
,_/
(c)
lnstall the throttle body with the 4 bolts.
Torque: 21 N-m (210 kgf-cm. 16 ft-Ibf)
HINT: Different bolt lengths are used for the upper
and lower sides.
Bolt length:
Upper side: 40 mm (1.59 in.)
Lower side: 65 mm (2.56 in.)
\/"*1 \
' /{,';.:r3'\§
(2)
'v *3'? 1.»,
'hi? @ fig
'
/
Y
P17849
(1) A
(d)
Connect the following hoses:
(1)
Vacuum hose (from BVSV for EVAP)
(2)
PCV hose
A
We
\\\§;\
'x
(1)
6"
gi.
1 t .
Y PI7848
(e)
Connect the following connectors:
(1) Throttle position sensor connector
(2)
ISC valve connector
.
CONNECT ACCELERATOR CABLE TO THROTTLE
BODY
3.
INSTALL AIR CLEANER CAP AND HOSE
4.
CONNECT INTAKE AIR TEMPERATURE SENSOR TO
AIR CLEANER CAP
5.
FILL WITH ENGINE COOLANT
6.
CONNECT NEGATIVE (—) TERMINAL CABLE TO
BATTERY
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents