Delta C2000 Series User Manual page 226

Vector control drive
Hide thumbs Also See for C2000 Series:
Table of Contents

Advertisement

Frame F
1. Loosen 12 screws and remove Fixture 2.
1
6
5
12
7
8
FIXTURE 2
9
10
11
3. Loosen screw 13 ~26 and remove Fixture 1.
13
19
18
17
20
26
25
24
FIXTURE1
23
21
22
5.
Place 4 of the M12 screws through Fixture 1&2 and
plate then fasten the screws.
Screw torque: 300~400 kg-cm / [260~347 Ib-in.] /
[29.4~39.2 Nm]
Screws M 12*4
4
3
2
16
14
15
Chapter 7 Optional AccessoriesC2000
2. Loosen 12 screws and remove Fixture 2.
Screw torque: 24~26 kg-cm / [20.8~22.6 Ib-in.] /
[2.4~2.5 Nm]
1
6
5
12
7
8
FIXTURE2
9
10
11
4.
Install Fixture 1 by fasten screw 13 ~26
Screw torque: 24~26 kg-cm / [20.8~22.6 Ib-in.] /
[2.4~2.5 Nm]
13
19
18
17
20
26
25
24
FIXTURE1
23
21
7-119
4
3
2
16
14
15
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents