Delta C2000 Series User Manual page 182

Vector control drive
Hide thumbs Also See for C2000 Series:
Table of Contents

Advertisement

Conduit Box Installation
Frame D0
1.
Loosen the cover screws and press the tabs on each side of the cover to remove the cover, as shown in the
following figure.
Screw torque: 12~15 kg-cm / [10.4~13 Ib-in.] / [1.2~1.5 Nm]
2.
Remove the 5 screws shown in the following figure.
Screw torque: 24~26 kg-cm / [20.8~22.6 Ib-in.] / [2.4~2.5 Nm]
3.
Install the conduit box by fasten the 5 screws shown in the following figure.
Screw torque: 24~26 kg-cm / [20.8~22.6 Ib-in.] / [2.4~2.5 Nm]
Chapter 7 Optional AccessoriesC2000
7-75