Computer; Reconstruction Hardware; Monitors - GE Revolution CT User Manual

Tomography scanner
Table of Contents

Advertisement

Number
Computer power on/off switch
Located on the back of the computer chassis as Item #2 below (item #1 is the Scanner Desktop power indicator).
4

2.1 Computer

The system uses a PC computer running Linux operating system. The system includes system,
image and scan data disks and stores up to 700,000 512
scan data files. The computer is usually located under the Scanner Desktop.

2.2 Reconstruction hardware

The reconstruction engine provides advanced processing capabilities for reconstructing routine
imaging modes. Reconstruction hardware, including scan data disks, is contained in the system
cabinet, not in the console chassis.

2.3 Monitors

The system includes two monitors, a scan monitor and a display monitor.
160
Use to Turn off/on the computer if system functions are not accessible at the scanner desktop controls.
Use to completely Power Off the computer chassis.
Illustration 3: System Monitors
Number
Description
1
Scan monitor
2
Display monitor
NOTICE
When powering on, it takes 30 minutes for the monitors to reach their set
brightness and contrast levels. During this time, do not make any adjustments to
the brightness or contrast levels.
Revolution CT User Manual
Direction 5480385-1EN, Revision 1
Description
images, with one terabyte for 1500
2
2 Scanner Desktop

Advertisement

Table of Contents
loading

Table of Contents