Use Ilinq; Launch Ilinq; Terminate Ilinq Remote Connection - GE Revolution CT User Manual

Tomography scanner
Table of Contents

Advertisement

4.3 Use iLinq

Use iLinq to access GE Online Center engineers and Answerline Applications Specialists.
The iLinq tools are designed so you can get information yourself, rather than having to always
rely on a FE or an Online Center Engineer. The Applications Self Help feature provides
automated expert advice from a database of application problems and solutions.
Answer questions — Top 10 FAQs.
Search the Knowledge Database.
Share the knowledge with coworkers by saving the results.
If InSite is running the Remote Safety test, New Patient does not open. To access New Patient:
call InSite and request they abort the test
navigate to the

4.3.1 Launch iLinq

1.
From the image monitor, click
Utilities menu, click Troubleshooting , then iLinq .
2. From the
iLinq desktop will open.
The

4.3.2 Terminate iLinq remote connection

Use this procedure to terminate an iLinq connection when a GE representative initiated the
connection.
1. Click [New Patient].
A message is posted that the scan hardware resource is not available.
2. Wait three minutes and click [New Patient] again to begin scanning.
634
Service Desktop and select CleanUp option to cancel the test in progress
.
Revolution CT User Manual
Direction 5480385-1EN, Revision 1
4 System Troubleshooting

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Revolution CT and is the answer not in the manual?

Table of Contents

Save PDF