INSTALLATION OF CIRCUIT 101
7. Connect circuit 101 to B terminal (
&
). Position circuit 101 cable to
FIGURE 5
be in line with the nylon tie mount on the
starter.
8. Place the washer against circuit 101 cable
lug and secure cable lug and washer with
the nut. Tighten the nut to a torque of 22
lbf-ft.
washer p/n 500958 qty:1
nut p/n 5001761 qty:1
INSTALLATION OF CIRCUIT 101B
9. If not already done, remove the nut and
washer provided with the brand new
starter on S terminal (
10. Connect circuit 101B to S terminal.
Position circuit 101B cable to be in line
with the nylon tie mount on the starter.
11. Place the provided washer against circuit
101 cable lug and then secure cable lug
and washer with the nut provided. Tighten
the nut to 35 lbf-in.
12. Secure circuit 101 and 101B to the tie
mount using one nylon tie p/n 504016.
13. Tie circuit 101 and 101B together using
one nylon tie p/n 504637 as shown on
.
FIGURE 12
14. Apply anti-corrosion compound or Color
Guard
Rubber
p/n 684013) on starter terminals, cable
lugs and nuts (see
FIGURE 13
FIGURE 4
).
FIGURE 4
Coating
(Prevost
to
).
FIGURE 15
MI16-16 / Page 5 / 6
FIGURE 10
FIGURE 11
FIGURE 12
FIGURE 13
<QF7720955 rev 2>

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H3-45H3-45 vipX3-45X3-45 vip

Table of Contents