Apply a double-face self adhesive tape 1/8
by ¼ inch inside the molding onto the
whole length.
Apply a double-face self adhesive tape
1/32 by ¼ inch onto the whole length of the
gutter.
Apply Sika 252 inside the moldings onto
the whole length.
Position and fix vertical molding. Lean
vertical molding against lateral molding.
Make sure vertical molding lines up with
structural tubing.
Position and fix horizontal molding (gutter).
Lean gutter against vertical molding.
Position gutter just above Sika finishing
joint.
PA1621 Maintenance Manual All Series | Revised Sept 2019
SECTION 18b: X3 SERIES BODY
SECTION VIEW A-A
49