PREVOST H3-41 Maintenance Manual page 676

Hide thumbs Also See for H3-41:
Table of Contents

Advertisement

SECTION 18a: H3 SERIES BODY
36. SIDE PANEL INSTALLATION PROCEDURE FOR COACHES AND VIP
Material:
Anti-silicone (682989)
Tack cloth
CHIX cloth (682384)
Equipment:
Glue gun
Compression roller
SS Body structure preparation
1.00
Clean using anti-silicone.
A)
See SAV000001 section A.
Use Scotchbrite to sand structure.
Use 1 side of Scotchbrite for 1 side of
vehicle.
SAV000001 Section A Alcohol or Anti-silicone
3. Allow to dry
Mandatory
Minimum time : Wait for product to evaporate
After 2 hours: Start cleaning operation again
Before applying any other
product
Fiberglass panel preparation (fiber
1.05
72
PA1621 Maintenance Manual All Series
Blue cloth (682383)
Pure water
Scotchbrite gray (680226)
SECTION #1 SIDE PANEL INSTALLATION
1. Apply
CHIX cloth
If surface seems dusty, greasy or with finger marks, start
cleaning operation again.
side)
|
Revised Sept 2019
Sika 206 G+P 1 liter (683446)
Sika 252 black
Masking tape
2. Dry immediately
Blue cloth

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H3-45H3-45 vipX3-45X3-45 vip

Table of Contents