FIGURE 45
5. Unscrew three nuts (indicated with arrows)
and then remove the front angle (FIGURE 46).
FIGURE 46: REMOVE THE FRONT ANGLE
6. Remove the rear angle similarly.
FIGURE 47: REMOVE THE REAR ANGLE
7. Slide the batteries on a mobile scissor lift table
placed slightly lower than the battery deck
level.
FIGURE 48
Battery Installation
Reinstalling the batteries is quite similar as the
removal procedure but in reverse order.
However, special care should be taken to the
following points:
1. To respect battery polarity in the arrangement,
positive (+) and negative (-) signs are laser cut
on the battery deck steel sheet. When
installing the batteries, place the battery
negative and positive poles according to the
signs on the battery deck (Figure 49).
FIGURE 49: BATTERY BANK
2. Rest the aft batteries against the fold on the
battery deck. Rest the fore batteries against
the aft batteries.
FIGURE 50: PROPER POSITIONING OF THE BATTERIES
3. The upper end of the rods is shaped to match
with the angle (FIGURE 51).
PA1621 Maintenance Manual All Series | Revised Sept 2019
SECTION 06: ELECTRICAL
63