4. Click OK. You briefly see the Opening Resource dialog box, and then the instrument is visible in
the Instrument Console.

Creating a new TSP project

To create a new Test Script Processor (TSP
1. On the File menu in the TSP perspective, select New > TSP Project. The New TSP Project
dialog box opens.
2. Type a name for your project in the Project name box.
3. Select the location to create the new project.
4. Click Finish. The new project appears in the list of projects in the project navigator, and a file
named main.tsp is created in the project. You can rename the .tsp file.
5. If you do not want to build your project automatically when it is saved or run, from the Project
menu, clear Build Automatically.
If you make changes to your project and do not build it before you run it, the Problems tab may not
appear when problems are encountered.
DMM7510-901-01 Rev. B / May 2015
Figure 154: Instrument connected in TSB
®
) project:
Figure 155: New TSP Project dialog box
Section 7: Introduction to TSP commands
7-35

Advertisement

Table of Contents
loading

Table of Contents