9 Installation
9.9 Final inspections
After the device has been installed, perform these checks and tasks, before handing it to
the user.
1. Check that the mains cord is not damaged in any way.
2. Check that all covers are attached correctly.
3. Measure the protective earth resistance between the applicable measurement points
A and B. The resistance must be less than 300 mΩ.
Measurement point A - Power supply
Permanent installation:
The protective earth connection in mains
line
NOTICE! With permanent installation, the resistance of protective earth
connections in the supply main may be taken into account.
Measurement points B - Device
Back panel fixing screw:
Measurement points B - CEPH unit
CEPH tubehead top cover screw:
156
Reviewed Suuronen Esa 2019-09-19 12:21
Approved Lassinen Juuso 2019-10-02 14:37
Non-permanent installation:
The earth pin of mains cord plug
Patient handle fixing screw (either):
CEPH head support mount top cover
screw (either):
ORTHOPANTOMOGRAPH
™
OP 3D
D519207, 19